Supply Needs
Browse active project material and service needs by category, parish, quote date, delivery window, and fit.
Supply need detail
Mandeville Electrical Items
Project-linked request for electrical make-safe materials, classroom fixture replacements, conduit, breakers, and basic safety items for the Mandeville School repair package.
Supply package objective
Price the requested package against project, delivery, budget, and proof gates.
Project-linked request for electrical make-safe materials, classroom fixture replacements, conduit, breakers, and basic safety items for the Mandeville School repair package.
JMD 1.4M
Mandeville School Repair Package
Manchester
July 6, 2026
Budget and quote basis
The planning band helps suppliers decide whether to quote and gives reviewers enough structure to compare price, delivery, substitutions, and readiness.
JMD 1.4M
| Field | What to verify | Signal |
|---|---|---|
| Budget | Planning band for supplier pricing comparison; not an approved invoice amount. | JMD 1.4M |
| Budget detail | Quote should separate unit price, package price, delivery, offloading, substitutes, and assumptions. | Supplier priced |
| Close date | Quotes should be submitted before the visible review window closes. | July 6, 2026 |
| Delivery window | Supplier should confirm lead time, transport, receipt contact, and proof package. | 18 calendar days after order acceptance |
Package detail
The school package needs electrical materials that can be priced as classroom-ready lots and separated from labor or inspection authority.
PVC conduit and junction boxes
LED classroom fixtures
Breaker panel components
Cable and termination accessories
Basic safety gear and labels
Readiness checks
Before quoting, Mandeville Materials should confirm which items require product certification and which substitutions are acceptable for school use.
Attach product certificates
Identify substitutes by brand or rating
Confirm stock count
Confirm delivery window
Route questions through the project room
Delivery and proof
Delivery has to be priced as part of the package, including timing, offloading, receipt confirmation, and proof of delivery after order acceptance.
Delivery parish: Manchester
Requested delivery: 18 calendar days after order acceptance
Confirm vehicle, offloading, and site-contact assumptions.
State any delivery exclusions before the quote is submitted.
Supplier documents
Supplier documents should be visible before quote selection, and product-specific evidence should travel with the package when certification matters.
Company registration
TRN and Tax Compliance Certificate
Product certificates where required
Line-item quote
Delivery and offloading plan
Receipt and proof package
Operational links
A selected quote should link back to the Mandeville School bid and project workspace without exposing internal award scoring.
Selected quote creates an order
Accepted order opens delivery tracking
Delivery proof supports invoice review
Project links remain role-safe
Need facts
Electrical repair items
Mandeville School Repair Package
Southern Parishes Community Recovery Works
Mandeville School Electrical Make-Safe
Manchester
July 6, 2026
18 calendar days after order acceptance
JMD 1.4M
Review fit because stock is partially matched and electrical certification needs to be attached before selection
Quote readiness
Use these checks to decide whether the supplier quote stepper has enough price, delivery, and document context to proceed.
Planning band visible: JMD 1.4M
Delivery basis visible: 18 calendar days after order acceptance
Line items, substitutions, and lead times can be priced separately.
Supplier documents and product evidence can travel with the quote.
Order, delivery, and invoice records stay linked after selection.