APR-NWA-069 agency clearance

Agency clearance is connected to the project record so NaRRA can see the blocker while the contractor sees the next allowed action.


Programme

SP-CRWP-2026

Project

PRJ-STEL-BRB-026 Black River Bridge Approach Repairs

Parish

St. Elizabeth

Amount band

JMD 51M

Current gate

Pending

Next action

Open approval

Connected records

This record is part of the NaRRA Register recovery chain so contractor, supplier, and investor views stay connected to the same project, source records, and role-safe next actions.

RFP-2026-061
BID-SCW-1194
NEED-BRB-BASE-077
QUO-BRA-0342
ORD-BRB-0342
DEL-BRB-0160
INV-BRA-0327
ROOM-BRB-ACCESS