Bids
Submit bid packages, track statuses, amend bids, and review award outcomes.
Bid package
Mandeville School Bid
Proposal saved. Estimate, team, timeline, documents, and review steps remain before submission.
Draft bid package in progress
Complete each bid step, review the package, then submit it as a human-controlled action.
Mandeville School draft
Mandeville School Electrical Make-Safe
Mandeville School Repairs
Manchester
Step 1
Proposal
Step 2
Estimate
Step 3
Team
Step 4
Timeline
Step 5
Documents
Step 6
Review
Proposal narrative
BlueCrest proposes a staged roof and drainage recovery approach for Santa Cruz Market that protects vendor access, isolates work zones, and gives NaRRA inspection-ready evidence at each milestone. The proposal prioritizes weatherproofing, safe circulation, and clear handoff documentation.
Method
Staged demolition, replacement, waterproofing, and closeout by market block.
Quality control
Daily site photos, material receipts, supervisor sign-off, and inspection checklist.
Assumptions
Vendor access remains active with restricted zones and scheduled delivery windows.
Estimate and cost breakdown
Cost categories stay visible so reviewers can understand the bid basis.
Total estimate
JMD 31.5M
| Category | Basis | Amount |
|---|---|---|
| Labour | Roof crew, waterproofing technicians, safety marshal | JMD 9.8M |
| Materials | Roof sheets, ridge caps, flashing, fasteners, sealants | JMD 14.6M |
| Equipment | Scaffolding, lift support, disposal, transport | JMD 3.2M |
| Preliminaries | Site setup, access protection, permits, supervision | JMD 2.5M |
| Contingency | Weather and market-access staging allowance | JMD 1.4M |
Proposed team
Marsha Campbell
Project lead · Primary contractor admin
Devon Riley
Site supervisor · 12 years roof works
Alana Grant
Safety officer · Site safety and access control
Kemar Blake
Drainage lead · Minor civil works
Proposed timeline
Mobilization
3 daysSite handoff, vendor access plan, material staging
Roof replacement
10 daysSheeting, flashing, ridge caps, and gutter works
Drainage corrections
5 daysRunoff correction and minor civil repair
Inspection closeout
2 daysEvidence pack, punch list, handover photos
Bid documents
| Document | Purpose | Status | Action |
|---|---|---|---|
| Technical method statement | Shows staging, work method, and quality checks | Attached | View |
| Tax Compliance Certificate | Confirms contractor tax standing for procurement | Accepted | View |
| Company registration | Confirms legal business registration in Jamaica | Accepted | View |
| Authorized representative ID | Confirms the workspace owner and signatory | Accepted | View |
| Supplier quotation basis | Supports the material price assumptions | Pending | View |
Package review
Review consolidates the bid narrative, cost basis, team, timeline, and documents before submission or amendment. A project workspace is not available from this state unless NaRRA awards the bid and the contractor accepts the contract.
Proposal
Estimate
Team
Timeline
Documents
Review
Draft package gaps
The bid has a proposal shell but still needs the estimate, certified electrical partner note, school-safe work sequence, updated insurance, and supplier assumptions.
Submission boundary
Register can guide the draft, but BlueCrest must complete a human review before any bid package is submitted into procurement.
Mandeville School draft
Mandeville School Electrical Make-Safe
Mandeville School Repairs
Manchester
June 28, 2026 internal bid package target
JMD 24M
Submission gate
Only a human user can submit the completed bid package. AI may summarize gaps, but it cannot submit, approve, deny, or award.