Bids

Submit bid packages, track statuses, amend bids, and review award outcomes.

Under review
Bids

Bid package

Annotto Bay Drainage Bid

Bid package links the RFP, project scope, estimate, team plan, supplier assumptions, and required compliance records.


Sections

OverviewStepsProposalEstimateTeamTimelineDocumentsReviewBid packageJamaica operating cont...Planning and next stepRole-safe visibilityFacts

Submitted bid package under review

This bid has already been submitted. You can review the proposal, estimate, team, timeline, and documents, but a project workspace only unlocks after award and contract acceptance.

Under review
Source state

Planned Register sample for a future source-backed integration

Programme

Eastern Recovery Works

Project

Annotto Bay Drainage Works

Record ID

BID-EPB-1190

Step 1

Submitted

Proposal

Step 2

Submitted

Estimate

Step 3

Submitted

Team

Step 4

Submitted

Timeline

Step 5

Submitted

Documents

Step 6

Under review

Review

Proposal narrative

BlueCrest proposes a staged roof and drainage recovery approach for Santa Cruz Market that protects vendor access, isolates work zones, and gives NaRRA inspection-ready evidence at each milestone. The proposal prioritizes weatherproofing, safe circulation, and clear handoff documentation.

Method

Staged demolition, replacement, waterproofing, and closeout by market block.

Quality control

Daily site photos, material receipts, supervisor sign-off, and inspection checklist.

Assumptions

Vendor access remains active with restricted zones and scheduled delivery windows.

Estimate and cost breakdown

Cost categories stay visible so reviewers can understand the bid basis.

Total estimate

JMD 31.5M

CategoryBasisAmount
LabourRoof crew, waterproofing technicians, safety marshalJMD 9.8M
MaterialsRoof sheets, ridge caps, flashing, fasteners, sealantsJMD 14.6M
EquipmentScaffolding, lift support, disposal, transportJMD 3.2M
PreliminariesSite setup, access protection, permits, supervisionJMD 2.5M
ContingencyWeather and market-access staging allowanceJMD 1.4M

Proposed team

MC

Marsha Campbell

Project lead · Primary contractor admin

Verified
DR

Devon Riley

Site supervisor · 12 years roof works

Verified
AG

Alana Grant

Safety officer · Site safety and access control

Ready
KB

Kemar Blake

Drainage lead · Minor civil works

Ready

Proposed timeline

1

Mobilization

3 days

Site handoff, vendor access plan, material staging

2

Roof replacement

10 days

Sheeting, flashing, ridge caps, and gutter works

3

Drainage corrections

5 days

Runoff correction and minor civil repair

4

Inspection closeout

2 days

Evidence pack, punch list, handover photos

Bid documents

DocumentPurposeStatusAction
Technical method statementShows staging, work method, and quality checks
Attached
View
Tax Compliance CertificateConfirms contractor tax standing for procurement
Accepted
View
Company registrationConfirms legal business registration in Jamaica
Accepted
View
Authorized representative IDConfirms the workspace owner and signatory
Accepted
View
Supplier quotation basisSupports the material price assumptions
Attached
View

Package review

Review consolidates the bid narrative, cost basis, team, timeline, and documents before submission or amendment. A project workspace is not available from this state unless NaRRA awards the bid and the contractor accepts the contract.

Proposal

Submitted

Estimate

Submitted

Team

Submitted

Timeline

Submitted

Documents

Submitted

Review

Under review

Bid package

Annotto Bay Drainage Works bid keeps proposal, estimate, supplier assumptions, workforce plan, timeline, and compliance attachments together before submission or amendment.

Proposal
Estimate
Team plan
Timeline
Compliance documents

Jamaica operating context

Annotto Bay Drainage & Clinic Access Works is grounded in Annotto Bay clinic access and coastal drainage area. The sample keeps parish, local logistics, public-side touchpoint, and project-safe source chain visible before role-specific actions move forward.

Drain cleaning, pipe or culvert works, and erosion control
Traffic and pedestrian access management around the work area
Aggregate, pipe, and haulage supply coordination
NWA or municipal handoff evidence before closeout

Planning and next step

JMD 35M is a recovery planning band for this sample chain, not private supplier pricing, a payment instruction, or an award decision. The participant-facing date is Jul 27, 2026.

Budget use: pipes or culverts, aggregates, erosion control, traffic management, and closeout evidence
Date to watch: Jul 27, 2026
Public-side touchpoint: Road or drainage coordination with NWA
Allowed next action: Open bid

Role-safe visibility

Register shows contractor-allowed project, bid, document, supplier, invoice, and Atlas conversation context without Command-private notes or competitor data.

Eastern Parish Builders Ltd. sees its own bids, projects, suppliers, documents, invoices, and Atlas conversations.
Competing bids, internal evaluation notes, finance operations, and worker private data stay hidden.
Supplier and investor context appears only as role-safe capacity signals around Annotto Bay Drainage Works.
Source state

Planned Register sample for a future source-backed integration

Programme

Eastern Recovery Works

Project

Annotto Bay Drainage Works

Record ID

BID-EPB-1190

Parish

St. Mary

Location context

Annotto Bay clinic access and coastal drainage area

Review state

This bid is locked for procurement review. It can receive an award outcome, a written reason, or an amendment request, but it cannot become a project from this screen.